RED SEA DIVING GROUP
Offshore Work
Tasks Performed:

1- Using explosives .
2- S.P.M., Installation, Servicing ,and dismantling .
3- Cementing and sand bagging .
4- Soil investigation (pre installing any construction, and Pipe line rout survey ).
5- Pipe line work (Rout survey , trench survey , preparing the trench , during laying or pulling monitoring , after installing inspection and videoing , free span  measuring and bagging , cracks or any default remedy .
6- Cable laying .
7- Platform services (installations, monitoring piles grouting during on bottom fixing, inspections , replacing any cracked member, and any other work).
8- Inspecting any area in the offshore field , and debris evacuation .
9- Inspecting any part of the (sub - sea )   intervention:
9.1- By visual inspection.
9.2- Still photographing.
9.3- Videoing  and reporting .
10- Inspecting any part of the (sub - sea )   intervention by thickness gauging , reporting  the result advising method of repairs  magnetic particle inspecting , through cracks measurements , and reporting .
11- Inspecting the anodes , or any other means of cathodic protection.
12- Splash zone coating .
13- Servicing any vessels used in the field .
14- U /W Cutting.
15- U/W wet welding

RED SEA DIVING GROUP

www.redseadivinggroup.com
Since 1975
1- Inspection Work
1- Inspection Work
2- Pipe Line Work
2- Pipe Line Work
Tasks Performed :
1-        Soil investigation .
2-        Route inspection.
3-        Trenching.
4-        Trench excavation .
5-        Monitoring during laying .
6-        After laying inspection and measuring the free spans .
7-        Free span filling .
8-        Anchoring by piling , sand bagging , or elephant bags .
9-        Periodical inspection.
10-        Pigging .
11-        Repair work .
12-        Using explosives.

3- S.P.M.
4- Soil Investigation
5- Projects  & Construction Work
 
 
3- S.P.M.
 
4- Soil Investigation
5- Projects  & Construction Work
     TASKS PERFORMED
       1- Boring before platforms designing.
       2- Boring pre pipe line route work.
       3- Boring before :"SPM" anchoring .
       4- Boring before rig anchoring.
       5- Boring after capsized rig .
       6- Boring for pipe line anchoring .
       7- Boring before rig movment .

 
 

1975
1977
1986
1992
2007
All Rights Reserved to RedSeaDivingGroup © 2011     -    This Site Designed & Hosting By Spider Multimedia

www.redreaegypt.com